Skip to main content

Posts: Change Order of Images

Users can now adjust the order of images in their draft posts using the arrow buttons.

Written by Product

New Feature Update Previously, users could rearrange images in draft posts using a drag-and-drop function. This feature has been updated, and users must now use the left and right arrow buttons that appear at the bottom of an image to reorder them.

How to Reorder Images in a Draft Post

  1. Open your draft post.

  2. Locate the images attached to your post.

  3. Hover your mouse over an image to reveal the left (⬅) and right (➡) arrow buttons at the bottom.

  4. Click the left arrow to move the image left or the right arrow to move it right.

  5. Repeat for any other images as needed.

  6. Once satisfied with the arrangement, save your draft.

Visual Reference When you hover over an image, the arrow buttons will appear at the bottom, allowing you to adjust the image order.

For more details, visit Properti.ai or contact [email protected].

Did this answer your question?